Client Information

Project Description
To create a manege, horse walker, upgrade the stable block and supply lighting and power to the new hay storage sheds
Project Details
The project began in January 2016 by running ducting to all light positions to enable SWA cables to be pulled in at a later date.
All the ducting went back to underground connections points and access covers.
A new consumer unit was installed in the garage to separate al the equestrian feeds away from the main house.
Equipment Installed
Hager double stack consumer unit.
1000’s of metres of cable.
3 of our installation team.